Wednesday, 12 December 2012

The End is always Tomorrow

As of last Monday, here's what was left (and when it was supposed to be done) before our kitchen project was finished:

  • Final painting (Monday)
  • Grouting the backsplash (Monday)
  • Kitchen cabinet "but" list items (Tuesday)
  • Installation of the hood fan (Tuesday)
  • Completion of the electrical (Wednesday)
Based on this, we shut down our temporary kitchen space and moved to our new kitchen space on Sunday in anticipation of completion. We even used the kitchen space as prep zone on Sunday night (though I'm still cooking outside in -15° temps). Now, we did this in part because a friend from Ontario started staying with us on Monday night, and we needed to turn our guest room back into a guest room. But still, we're supposed to be done Wednesday.

When we started the week, everything was lined up for a Wednesday finish. All the trades were scheduled. But...

It's Canmore.

Monday, the painter dudes came and wrapped us up in plastic and drop cloths.
Everything we need is under wraps
Made it kinda hard to access anything to cook. Then the grout dude delayed a day -- meaning he got in the way of the kitchen dude. They made a mess on Tuesday, and all the while the painter dudes were still painting (which in the end took 3 days, not 1).

Kitchen dude spent several hours re-installing the fridge, and the panels on the front of the fridge. He was also able to finish some other stuff, like the wine rack interior...
Better
...and the toe kick under the dishwasher, but he has still not received many kitchen "but" list parts we thought we would have by now (glass shelves for one cupboard, a latch for another, bases for 2 others, a replacement door, a replacement trim bit, etc) so he won't be back "for some time". 

Accordingly, hood fan dude was delayed a day, and only got in late today to partially re-install the fan.
Panels on, grout done (but not cleaned) and fan partially installed
And thus, electrical dude got delayed a day (now supposedly here Thursday) and after he's done (hopefully in 1 day), hood fan dude STILL needs to come back to connect the vent pipe and put on the chimney cover (probably Friday) after the electrical dude is done. A 1 day hood fan job becomes a 2 day job.

In typical Canmore time, what was supposed to be 3 more days of work turned out to be 5 more days of work -- 66% longer than expected.

It's seeming these days like the end of this project is always "tomorrow". As the immortal Frank Sinatra once sang:

Let's forget about tomorrow,
For tomorrow never comes.