Sunday 24 June 2007

Kitchen Update, Week 7

Progress is very slow these days. I noted that one cabinet per day was being installed; there were only 2 left to do last week, and they were done. The back door got replaced, too. I gather they are stuck, since countertops have to be installed before the upper cabintry can be done. That doesn't explain why the drawer banks either side of the stove are still missing. In any case, here's the latest.

The hall cupboard is now "in". I had asked for an open wine rack. Maybe they're not finished. Here's with and without door. The cutout in the lower part is for the freezer.




The rest hasn't changed much. The stove wall is now "spaced out".



And here the new rear door. I like the plastic, personally.



The finishing of the hardwood was supposed to be this week. However, the hardwood guy delayed a week. We're assuming they're going to start painting this week (it was supposed to happen next week; we assume the weeks have shifted). But at this stage, who knows? We're still "on schedule" apparantly.